Asana × Asurion
37% faster project initiation time
Fragmented, slow intake to automated, coordinated execution
Members read free
Enter your email to open every case study in the library: the full screenshot, why it works, and the one thing worth stealing. One email unlocks all of them.
Free. No spam. Unsubscribe anytime.
You're in — enjoy the library.
The case study leads with a concrete efficiency number (37% faster initiation) and supports it with a second metric (89% team utilization), giving the story two quantified anchors rather than relying on sentiment alone. The Clarity thread is real but secondary: improved visibility is framed as the mechanism that enables faster execution, not the headline win. The Microsoft Power Platform integration detail is specific enough to make the transformation credible rather than generic.
Pairing a workflow efficiency metric with a capacity utilization metric gives the story a before/after shape on two dimensions, making the ROI case harder to dismiss than a single number alone.
Click to enlarge ↗ This is editorial commentary and curation. The case study, screenshot, and all metrics are Asana's published work; we link to the source and lead with our analysis.