← All case studies

BambooHR × ISTS (International Scholarship and Tuition Services)

BambooHR x ISTS, $40K saved by fixing performance reviews

$40,000 in annual savings

Dreading reviews to running them four times a year

Members read free

Unlock the full breakdown

Enter your email to open every case study in the library: the full screenshot, why it works, and the one thing worth stealing. One email unlocks all of them.

Free. No spam. Unsubscribe anytime.

Why it works

The story earns its headline number by showing the before state in concrete terms: two weeks of manager time per review cycle, every six months. The $40,000 savings figure is specific to this customer and tied directly to the time reduction from several hours to 15 minutes per employee. The secondary Clarity tag is justified because BambooHR also gave Jennifer visibility into disengagement and misalignment she could not see before, though the story leads firmly with the cost and time reduction.

Steal this

Anchor the savings figure to a before-state unit of work the reader can picture: 'two weeks of manager time every cycle' makes the $40,000 feel earned rather than asserted.

Full screenshot of BambooHR x ISTS, $40K saved by fixing performance reviews Click to enlarge ↗
View the original on bamboohr.com ↗

This is editorial commentary and curation. The case study, screenshot, and all metrics are BambooHR's published work; we link to the source and lead with our analysis.

  • Vendor BambooHR
  • Customer ISTS (International Scholarship and Tuition Services)
  • Industry Other
  • Trigger Manual paper-based review process was consuming two weeks of manager time every cycle
  • Format Written narrative
  • Structure Challenge-Solution-Results
  • Medium Web page