← All case studies

Constructor × Lumens

Constructor x Lumens: From hours of manual merchandising to minutes, with a revenue lift

Manual merchandising tasks reduced 6x (hours to minutes)

Operational drag to strategic bandwidth

Members read free

Unlock the full breakdown

Enter your email to open every case study in the library: the full screenshot, why it works, and the one thing worth stealing. One email unlocks all of them.

Free. No spam. Unsubscribe anytime.

Why it works

The case study earns its efficiency framing with a concrete before-and-after ratio (6x reduction, one-hour tasks to five to ten minutes) and ties it directly to named team members describing their daily work, which makes the claim credible. The revenue figures (+5.5% CVR, +6% RPV, $4.9M via COP) add a secondary Breakthrough layer without muddying the primary story. The dual payoff, less operational drag and measurable revenue gains, is a slight coin-flip between Efficiency and Breakthrough, but the headline and opening lead decisively with time savings, so Efficiency wins.

Steal this

Anchor the efficiency story to a specific job on a specific team member's plate, then show the before task count and after task count side by side. Becca's scheduling and slotting example makes the 6x claim tangible rather than abstract.

Full screenshot of Constructor x Lumens: From hours of manual merchandising to minutes, with a revenue lift Click to enlarge ↗
View the original on constructor.com ↗

This is editorial commentary and curation. The case study, screenshot, and all metrics are Constructor's published work; we link to the source and lead with our analysis.

  • Vendor Constructor
  • Customer Lumens
  • Industry Ecommerce / Retail
  • Trigger Legacy keyword-matching system required unsustainable manual rule-writing for a lean team
  • Format Written narrative
  • Structure Challenge-Solution-Results
  • Medium Web page