← All case studies

Depot × Jane

Depot x Jane, CI costs cut in half with 2.4x faster builds

55% reduction in GitHub Actions spend

Frustrated and vocal developers to fast, frustration-free pipelines

Members read free

Unlock the full breakdown

Enter your email to open every case study in the library: the full screenshot, why it works, and the one thing worth stealing. One email unlocks all of them.

Free. No spam. Unsubscribe anytime.

Why it works

The case study earns its claims by naming three distinct before-state problems: slow Docker image downloads, a 40% pipeline success rate requiring manual retries, and surprise cost increases after a four-month consolidation effort. Each result (2.4x speed, 25% throughput, 55% cost reduction) maps directly back to one of those problems, so the numbers feel earned rather than decorative. The Slack SLA anecdote and the CTO writing a custom GitHub Action give the support story concrete texture that most vendor case studies omit.

Steal this

Anchor the support story with a specific, absurd-but-true detail. The '35-second SLA' claim and the named co-founder writing a custom action on the customer's behalf does more credibility work than any generic 'dedicated support team' claim could.

Full screenshot of Depot x Jane, CI costs cut in half with 2.4x faster builds Click to enlarge ↗
View the original on depot.dev ↗

This is editorial commentary and curation. The case study, screenshot, and all metrics are Depot's published work; we link to the source and lead with our analysis.

  • Vendor Depot
  • Customer Jane
  • Industry SaaS
  • Trigger GitHub Actions consolidation cost more than the three prior CI systems combined
  • Format Written narrative
  • Structure Challenge-Solution-Results
  • Medium Web page