Hexaly × Centre National d'Etudes Spatiales (CNES)
Near-optimal schedules in 45 seconds on average
Manual schedule building to automated near-optimal results
Members read free
Enter your email to open every case study in the library: the full screenshot, why it works, and the one thing worth stealing. One email unlocks all of them.
Free. No spam. Unsubscribe anytime.
You're in — enjoy the library.
The before-state is concrete and damning: the previous tool regularly failed to deliver solutions, forcing manual schedule building. Winning a formal benchmark against two named IBM solvers gives the competitive switch strong credibility. The story leans toward New Capability because the multi-objective partial-solution feature was not achievable with the incumbents at all, not merely slower.
Citing the formal public tender and named benchmark competitors (IBM ILOG CPLEX, IBM ILOG CP Optimizer) as the selection process. This turns vendor selection into a verifiable, third-party-validated proof point rather than a testimonial.
Click to enlarge ↗ This is editorial commentary and curation. The case study, screenshot, and all metrics are Hexaly's published work; we link to the source and lead with our analysis.