Hexaly × Hesus
14% reduction in transportation costs
Members read free
Enter your email to open every case study in the library: the full screenshot, why it works, and the one thing worth stealing. One email unlocks all of them.
Free. No spam. Unsubscribe anytime.
You're in — enjoy the library.
The case study earns its headline number with a concrete mechanism: the optimizer reduces empty truck repositioning miles and improves daily timetable utilization, giving readers a replicable logic rather than a vague claim. The before-state is well-described as a manual, combinatorially complex VRP that human planners could not solve efficiently at scale. The quote from the Logistics Director confirms the 14% figure, which prevents it from floating as a vendor-only stat.
The mechanism section walks through three distinct levers the engine pulls (smarter repositioning, timetable filling, contractor selection tradeoff) which makes the result feel earned and transferable. Structuring results around named levers rather than a single before-after slide is worth copying.
Click to enlarge ↗ This is editorial commentary and curation. The case study, screenshot, and all metrics are Hexaly's published work; we link to the source and lead with our analysis.