← All case studies

Hexaly × Keolis Santé

Hexaly x Keolis Santé, 4-6 hours of scheduling work cut to five minutes

4 to 6 hours of manual computation saved per regulation center per day

Manual, time-consuming scheduling to near-optimal plans in five minutes

Members read free

Unlock the full breakdown

Enter your email to open every case study in the library: the full screenshot, why it works, and the one thing worth stealing. One email unlocks all of them.

Free. No spam. Unsubscribe anytime.

Why it works

The story has a concrete before-state (manual scheduling consuming 4 to 6 hours per regulation center) and a specific mechanism (lexicographic multi-objective optimization handling soft constraints). The scale of the problem is grounded with real numbers: 500 missions, 50 employees, five-minute solve time. The CDO quote carries operational information rather than generic praise, though it stops short of quantifying revenue or cost impact.

Steal this

Anchor the efficiency claim with two numbers side by side: the old manual time cost (4 to 6 hours) and the new computation time (five minutes). This pairing makes the gain visceral without needing a percentage.

Full screenshot of Hexaly x Keolis Santé, 4-6 hours of scheduling work cut to five minutes Click to enlarge ↗
View the original on hexaly.com ↗

This is editorial commentary and curation. The case study, screenshot, and all metrics are Hexaly's published work; we link to the source and lead with our analysis.

  • Vendor Hexaly
  • Customer Keolis Santé
  • Industry Travel / Transport
  • Trigger Complex regulatory and operational constraints made manual patient transport scheduling impractical at scale
  • Format Written narrative
  • Structure Challenge-Solution-Results
  • Medium Web page