← All case studies

Ramp × Pair Eyewear

Ramp x Pair Eyewear, from three tools to one with 10+ hours saved monthly

10+ hours/month saved with auto-coding

Spreadsheet overload to streamlined, automated finance

Members read free

Unlock the full breakdown

Enter your email to open every case study in the library: the full screenshot, why it works, and the one thing worth stealing. One email unlocks all of them.

Free. No spam. Unsubscribe anytime.

Why it works

The piece leads with three concrete metrics (tool consolidation, hours saved, reimbursement speed) that all point downward in effort, making Efficiency the clear primary tag. Amortization scheduling is flagged as a net-new capability Pair could not do before, which justifies a secondary New Capability tag. The personal angle of the AP Manager gaining work-life balance adds a human dimension without inflating the story's claims.

Steal this

Anchor the efficiency story with three distinct time/effort metrics in the header, each measuring a different dimension of the same problem, so readers can self-identify with at least one.

Full screenshot of Ramp x Pair Eyewear, from three tools to one with 10+ hours saved monthly Click to enlarge ↗
View the original on ramp.com ↗

This is editorial commentary and curation. The case study, screenshot, and all metrics are Ramp's published work; we link to the source and lead with our analysis.

  • Vendor Ramp
  • Customer Pair Eyewear
  • Industry Ecommerce / Retail
  • Trigger New AP Manager hired and tasked with replacing a cumbersome, integration-poor system
  • Format Written narrative
  • Structure Challenge-Solution-Results
  • Medium Web page