← All case studies

Webflow × Getaround

Webflow x Getaround: Eight years of backlog cleared in months

80% increase in overall site sessions

Blocked by engineering to owning the website

Members read free

Unlock the full breakdown

Enter your email to open every case study in the library: the full screenshot, why it works, and the one thing worth stealing. One email unlocks all of them.

Free. No spam. Unsubscribe anytime.

Why it works

The story earns its Breakthrough tag because the headline leads with an 80% lift in site sessions, a number going up, not just time saved. The eight-year redesign freeze is a concrete before-state that makes the after feel earned rather than routine. The Efficiency angle is real and strong, but it is framed as the mechanism that produced growth, not the headline win.

Steal this

Anchor the before-state with a specific duration. 'Eight years without a major redesign' is far more vivid than 'we were slow before' and makes every result feel proportionally significant.

Full screenshot of Webflow x Getaround: Eight years of backlog cleared in months Click to enlarge ↗
View the original on webflow.com ↗

This is editorial commentary and curation. The case study, screenshot, and all metrics are Webflow's published work; we link to the source and lead with our analysis.

  • Vendor Webflow
  • Customer Getaround
  • Industry Travel / Transport
  • Trigger Growing marketing ambitions blocked by engineering prioritization for eight years
  • Format Written narrative
  • Structure Challenge-Solution-Results
  • Medium Web page