← All case studies

Alteryx × 日本触媒 (Nippon Shokubai)

Alteryx x Nippon Shokubai, R&D busywork cut to a fraction

1時間→5分(約1/12に削減)

Research time squeezed by manual tasks to researchers focused on core work

Why it works

The case study leads with two concrete time-reduction ratios, which makes the efficiency claim immediately legible even for readers unfamiliar with the customer. The before-state is clearly described: manual, siloed, person-dependent data prep was eating into research time. The mechanism is explained at a practical level, covering shared workflows built for 40-plus instruments, an internal education program, and on-demand workflow creation support, giving enough detail to replicate the approach.

Steal this

Opening with two side-by-side before/after time metrics in the headline section (1 hour to 5 min, 30 min to 3 min) gives readers an instant, scannable proof of value before they read a single line of narrative.

Members read free

See the full case study

Enter your email to see the full-page screenshot of this case study, and every other one in the library. One email unlocks all of them.

Free. No spam. Unsubscribe anytime.

Full screenshot of Alteryx x Nippon Shokubai, R&D busywork cut to a fraction Click to enlarge ↗
View the original on alteryx.com ↗

This is editorial commentary and curation. The case study, screenshot, and all metrics are Alteryx's published work; we link to the source and lead with our analysis.

  • Vendor Alteryx
  • Customer 日本触媒 (Nippon Shokubai)
  • Industry Industrial / Manufacturing
  • Trigger Growing burden of manual, person-dependent research support tasks under a 2030 DX vision
  • Format Written narrative
  • Structure Challenge-Solution-Results
  • Medium Web page