Dremio × E.ON Nordic
95% reduction in time-to-insight, queries from ~1 week to ~10 minutes
Data bottleneck to self-service analytics
Members read free
Enter your email to open every case study in the library: the full screenshot, why it works, and the one thing worth stealing. One email unlocks all of them.
Free. No spam. Unsubscribe anytime.
You're in — enjoy the library.
The 95% reduction figure is concrete and tied directly to this customer, giving the story a clear anchor. The before-state is unusually specific: queries taking up to a week, daily data refreshes, and rigid Spark jobs that blocked ad-hoc work. The story earns a secondary New Capability tag because one result, calculating solar panel output per municipality, is presented as previously impossible rather than merely slower.
Name a previously impossible analysis by example. The solar-panel-per-municipality use case turns an abstract capability claim into a tangible, memorable proof point that readers can picture.
Click to enlarge ↗ This is editorial commentary and curation. The case study, screenshot, and all metrics are Dremio's published work; we link to the source and lead with our analysis.