← All case studies

Dropbox × Binladin Contracting Group

Dropbox x Binladin Contracting Group, approvals from 2 days to 30 minutes

Procurement approval process cut from 2 days to 30 minutes

Slow, dispersed approvals to fast, remote collaboration

Why it works

The headline metric is a number going sharply down, which makes Efficiency the clear primary type. The case study is short and quote-driven, anchored by one crisp before-and-after stat that is easy to remember and repeat. The storage growth figure (26 TB to 60 TB) adds a secondary data point that shows adoption depth without muddying the core message.

Steal this

Anchor the story on a single, concrete time-to-approval comparison stated in the customer's own words. One specific process (IT hardware procurement) makes the abstract concept of faster approvals tangible.

Members read free

See the full case study

Enter your email to see the full-page screenshot of this case study, and every other one in the library. One email unlocks all of them.

Free. No spam. Unsubscribe anytime.

Full screenshot of Dropbox x Binladin Contracting Group, approvals from 2 days to 30 minutes Click to enlarge ↗
View the original on dropbox.com ↗

This is editorial commentary and curation. The case study, screenshot, and all metrics are Dropbox's published work; we link to the source and lead with our analysis.

  • Vendor Dropbox
  • Customer Binladin Contracting Group
  • Industry Industrial / Manufacturing
  • Trigger Geographically dispersed construction projects needed better governance and collaboration tools
  • Format Written narrative
  • Structure Challenge-Solution-Results
  • Medium Web page