Greenhouse × Bath Fitter
Retail time-to-fill cut 36%, from 69 days to 44 days
Working around the system to working inside one connected workflow
Members read free
Enter your email to open every case study in the library: the full screenshot, why it works, and the one thing worth stealing. One email unlocks all of them.
Free. No spam. Unsubscribe anytime.
You're in — enjoy the library.
The case study earns its headline number by anchoring it to a concrete before-and-after figure (69 days to 44 days), which gives the efficiency claim real weight. The three-part before-state is specific: hiring manager non-adoption, error-prone manual data entry between systems, and spreadsheet-dependent reporting. The UKG Pro integration detail is the mechanism that explains how the result was achieved, making the story replicable rather than generic.
Pair the headline metric with the exact baseline number (69 days, not just '36% faster') so the reader can feel the magnitude without doing math.
Click to enlarge ↗ This is editorial commentary and curation. The case study, screenshot, and all metrics are Greenhouse's published work; we link to the source and lead with our analysis.