← All case studies

Greenhouse × Oldcastle BuildingEnvelope (OBE)

Greenhouse x OBE, small team doubles recruiter capacity and forecasts $1M in savings

Recruiter capacity doubled from 15-20 to 30 requisitions per recruiter

Manual overload to self-service control

Why it works

The story anchors on two concrete, attributable numbers: recruiter req load doubling and a projected $1M agency spend reduction, both earned by a three-person configuration team. The before-state is specific and relatable: five hours of weekly spreadsheet work and recruiters hitting a hard wall at 20 reqs. The integration reliability angle adds a secondary Resilience thread, but the headline is squarely about doing more with the same headcount, so Efficiency wins the primary tag.

Steal this

Quantify the before-and-after of a mundane admin task (five hours of spreadsheets to under 30 minutes) alongside the headline metric. It makes the efficiency claim feel lived-in rather than abstract.

Members read free

See the full case study

Enter your email to see the full-page screenshot of this case study, and every other one in the library. One email unlocks all of them.

Free. No spam. Unsubscribe anytime.

Full screenshot of Greenhouse x OBE, small team doubles recruiter capacity and forecasts $1M in savings Click to enlarge ↗
View the original on greenhouse.com ↗

This is editorial commentary and curation. The case study, screenshot, and all metrics are Greenhouse's published work; we link to the source and lead with our analysis.

  • Vendor Greenhouse
  • Customer Oldcastle BuildingEnvelope (OBE)
  • Industry Industrial / Manufacturing
  • Trigger Growing hire volume outpaced a small TA team's manual processes
  • Format Written narrative
  • Structure Challenge-Solution-Results
  • Medium Web page