← All case studies

Sifflet × Adaptavist

Sifflet x Adaptavist: From days of debugging to hours, in three days of setup

+94% gain in testing efficiency (daily runs from hours to 10 minutes)

Bloated, opaque stack to full end-to-end lineage visibility

Members read free

Unlock the full breakdown

Enter your email to open every case study in the library: the full screenshot, why it works, and the one thing worth stealing. One email unlocks all of them.

Free. No spam. Unsubscribe anytime.

Why it works

The case study anchors on two concrete efficiency numbers (94% testing gain, 92% refactoring gain) that are specific to this customer, giving readers something to benchmark against. The quote from Callum O'Connor is genuinely informative: it walks through a real technical obstacle (cross-repo lineage to S3 via stored procedures) and the exact workaround used (mapping table parsed into declared assets sent via API). There is a mild coin-flip between Efficiency and Clarity because the before-state is partly about not seeing lineage at all, but the headline numbers and framing lead with time and effort saved, so Efficiency wins.

Steal this

The before/after debugging narrative (two days hunting nested CTEs vs. working backwards from a monitor to one piece of code) makes the time saving tangible and process-specific, not just a percentage drop. Pair a workflow description with the metric and readers will believe both.

Full screenshot of Sifflet x Adaptavist: From days of debugging to hours, in three days of setup Click to enlarge ↗
View the original on siffletdata.com ↗

This is editorial commentary and curation. The case study, screenshot, and all metrics are Sifflet's published work; we link to the source and lead with our analysis.

  • Vendor Sifflet
  • Customer Adaptavist
  • Industry Enterprise Software
  • Trigger Poly repo migration blocked by DBT's inability to draw lineage across repos
  • Format Written narrative
  • Structure Challenge-Solution-Results
  • Medium Web page