Industry

Industrial / Manufacturing case studies

38 published B2B case studies from industrial / manufacturing companies, each one tagged by the transformation it delivers and read for the one move worth stealing.

38 Case studies
Efficiency Most common story 50% here, 49% library-wide
95% Lead with a number 36 of 38 carry a headline metric
29% Name a competitor 28% across the whole library

What this slice looks like

38 case studies, published by 28 different vendors. The story these vendors tell most often here is Efficiency: 19 of them (50%), in line with the 49% across the library. 36 of 38 lead with a headline number, and 11 (29%) are about leaving a named competitor, in line with the 28% across the library.

Most featured: Docusign (3), Hexaly (3), Algolia (2), BambooHR (2), Druva (2)

Start with these

  1. Airtable × Schaeffler Airtable x Schaeffler, six tools down to one for global content ops

    50% reduction in content request age

    The AI-powered designer matching and agency sentiment scoring add a genuine New Capability layer, since those workflows did not exist before, but the headline metric is a number going down.

  2. Algolia × Ergodyne Algolia x Ergodyne, 190% search interaction lift for industrial safety gear brand

    190% increase in global search interactions, 6x click-throughs

    There is a genuine secondary New Capability thread: Ergodyne could not surface content alongside products at all before the federated search build, which was genuinely net-new.

  3. BambooHR × American Cedar & Millwork BambooHR x American Cedar & Millwork, eliminating overtime waste across three states

    25-30% reduction in unnecessary overtime

    The story anchors on two concrete cost numbers, $600 per month in clock rentals eliminated and a 25-30% reduction in overtime, which gives the efficiency claim real weight.

Every Industrial / Manufacturing case study

38
Screenshot of Airtable x Schaeffler, six tools down to one for global content ops

Steal this The parent-child app model detail, where local teams manage their own work while feeding a shared global calendar, is a specific architectural decision that makes the efficiency story believable rather than generic.

Airtable × Schaeffler

Airtable x Schaeffler, six tools down to one for global content ops

50% reduction in content request age

Efficiency
Screenshot of Algolia x Ergodyne, 190% search interaction lift for industrial safety gear brand

Steal this Anchoring the before/after on a usage-rate stat (35-40% of site visitors use the search navigator) rather than a revenue number makes the value of search feel concrete and non-inflated, a credible framing move for any tool with indirect ROI.

Algolia × Ergodyne

Algolia x Ergodyne, 190% search interaction lift for industrial safety gear brand

190% increase in global search interactions, 6x click-throughs

Breakthrough Switch
Screenshot of BambooHR x American Cedar & Millwork, eliminating overtime waste across three states

Steal this The lightning-strike anecdote. A single concrete failure moment makes the before-state memorable and earns reader sympathy faster than any list of inefficiencies.

BambooHR × American Cedar & Millwork

BambooHR x American Cedar & Millwork, eliminating overtime waste across three states

25-30% reduction in unnecessary overtime

Efficiency
Screenshot of FourKites x KeHE, Automating 65,000+ weekly notifications to free the sales team

Steal this Anchor the before-state to a named process step count ('four-step phone relay') so readers instantly grasp the friction without needing additional context.

FourKites × KeHE

FourKites x KeHE, Automating 65,000+ weekly notifications to free the sales team

55,000+ emails automated weekly

Efficiency
Screenshot of Geotab x Crown Uniform and Linen Service, anti-idling program cuts idle time 90%

Steal this The daily report sent to managers naming which drivers idled over the limit and flagging specific stops is a transferable accountability mechanism any fleet or operations story could adopt to show how data changed behavior.

Geotab × Crown Uniform and Linen Service

Geotab x Crown Uniform and Linen Service, anti-idling program cuts idle time 90%

Daily idling time reduced from 70 minutes per driver to 7 minutes

Efficiency
Screenshot of Hexaly x Pasco Shikishima, 32 million variables solved where Gurobi, CPLEX, and Xpress could not

Steal this Publish the exact benchmark setup, naming the competing products and explaining technically why they failed, so readers can self-qualify without a sales call.

Hexaly × Pasco Shikishima

Hexaly x Pasco Shikishima, 32 million variables solved where Gurobi, CPLEX, and Xpress could not

32 million variables solved in 3 minutes on a basic server

New Capability Switch
Screenshot of Hexaly x Renault, packaging logistics optimized at scale

Steal this Publishing the raw problem dimensions (variable count, constraint count, domain ranges, solve time, optimality gap) as a mini benchmark table inside the narrative. It replaces vague performance claims with verifiable technical evidence.

Hexaly × Renault Group

Hexaly x Renault, packaging logistics optimized at scale

below 1.5% optimality gap within 5 minutes on instances with 45,000 variables and 100,000 constraints

New Capability Switch
Screenshot of Hexaly x The Grain, scheduling in minutes not days

Steal this Citing the exact scale of the instances solved (15 packaging lines, 30 mixing tanks, 50,000 to 100,000 decision variables) makes the performance claim concrete and hard to dismiss, rather than relying on vague superlatives.

Hexaly × The Grain

Hexaly x The Grain, scheduling in minutes not days

Production scheduling from days to minutes

Efficiency
Screenshot of Matillion x Edmund Optics, AI chatbot cuts support time by 40%

Steal this Opening the results section with three concrete metrics in large-format callout numbers before the narrative begins. It anchors the reader with proof before they read the story, reducing skepticism throughout.

Matillion × Edmund Optics

Matillion x Edmund Optics, AI chatbot cuts support time by 40%

100 hours of engineering time saved per month

Efficiency
Screenshot of Mobly x Garrett Metal Detectors, more leads captured at every repeat show

Steal this The gamification detail: showing a post-event leaderboard of top scanners sparked rep competition and changed floor behavior. That single operational move is replicable by any vendor selling to field or event teams.

Mobly × Garrett Metal Detectors

Mobly x Garrett Metal Detectors, more leads captured at every repeat show

More contacts captured at every repeat show than the prior year; one event yielded more contacts than the past three years at that show combined

Breakthrough
Screenshot of BambooHR x CRBR, One day of monthly admin work eliminated

Steal this Use the employee's own words to describe the before-state in precise, vivid terms ('an entire whole day at the end of each month') rather than paraphrasing it in vendor language.

BambooHR × CRBR

BambooHR x CRBR, One day of monthly admin work eliminated

A full day of monthly admin work eliminated

Efficiency
Screenshot of BigCommerce x DESTACO, 65% more leads from a million-SKU rebuild

Steal this The 'I thought something was broken' reaction quote. Having a customer voice disbelief at their own results, then describe re-running the reports to confirm them, makes the outcome feel earned and trustworthy rather than polished. Use this pattern when results are large enough to strain credibility.

BigCommerce × DESTACO

BigCommerce x DESTACO, 65% more leads from a million-SKU rebuild

65% increase in leads compared to the previous six months

Breakthrough
Screenshot of BILL x Blackstone Products, three days of expense work cut to three hours

Steal this Use the petty cash elimination as a proof point. Quantifying a messy workaround ($12K/month in petty cash) and then showing its complete removal is more persuasive than a percentage-savings claim.

BILL × Blackstone Products

BILL x Blackstone Products, three days of expense work cut to three hours

Three days of expense processing down to three hours, with 40+ cardholders vs. a small number before

Efficiency
Screenshot of commercetools x Breville, 16 localized sites in 6 months

Steal this Anchor the results block with three numbered stats at the top of the page before the narrative begins. Readers get the payoff immediately and are pulled into the how.

commercetools × Breville

commercetools x Breville, 16 localized sites in 6 months

16 localized sites in 6 months, scaled to 80 by end of 2024

New Capability Switch
Screenshot of Dialpad x James River Equipment, 75% fewer repeat trips with two-way screen share

Steal this Lead the mechanism before the metric. The story explains exactly how screen sharing works (browser link, no app, two-way view of the parts catalog) before citing the 75% figure, which makes the number feel earned rather than asserted.

Dialpad × James River Equipment

Dialpad x James River Equipment, 75% fewer repeat trips with two-way screen share

75% reduction in repeat customer trips

Efficiency
Screenshot of Druva x NSi Industries, ransomware incidents survived with 100% data restored

Steal this Lead with a real incident survived, then let the insurance discount serve as third-party validation of the security improvement. This converts a vendor feature claim into an external proof point that readers can benchmark against their own premiums.

Druva × NSi Industries LLC

Druva x NSi Industries, ransomware incidents survived with 100% data restored

100% of data restored following two security incidents in 2023

Resilience Switch
Screenshot of FourKites x Ardent Mills, turning internal skeptics into self-service adopters

Steal this Name the exact objections that nearly killed adoption ('I don't trust it', 'My customers do not want to try') before showing how you overcame them. It turns a routine ROI story into a change-management story that resonates with anyone who has faced internal resistance.

FourKites × Ardent Mills

FourKites x Ardent Mills, turning internal skeptics into self-service adopters

19% fewer after-hours calls (112 incidents reduced)

Efficiency
Screenshot of Druva x Russell Finex, 100% data recovered across back-to-back ransomware attacks

Steal this Use a time-compressed stress test as proof: two attacks within 31 days is a stronger credibility signal than any benchmark, and framing recovery success inside a repeated incident makes the claim harder to dismiss.

Druva × Russell Finex

Druva x Russell Finex, 100% data recovered across back-to-back ransomware attacks

100% of data recovered across two ransomware attacks within 31 days

Resilience
Screenshot of Flexport x Globe Electric, 6x shipment growth with no added overhead

Steal this The single anecdote of the operations coordinator going on leave is the story's strongest asset. It gives a real moment of crisis that makes the before-state visceral and specific, and it leads directly to the decision to switch entirely to Flexport. Grounding a platform-visibility argument in one human moment of panic is worth copying.

Flexport × Globe Electric

Flexport x Globe Electric, 6x shipment growth with no added overhead

Processes reduced from 4-5 hours to 10-15 minutes

Efficiency
Screenshot of HubSpot x Allied Wire and Cable, 9x revenue from ditching Pardot

Steal this Anchor the before-state in a specific, absurd workflow detail. The image of designers copy-pasting HTML from Stripo into Pardot to use a paid tool as nothing but an email sender makes the pain immediate and memorable.

HubSpot × Allied Wire and Cable

HubSpot x Allied Wire and Cable, 9x revenue from ditching Pardot

9x increase in marketing-attributed revenue

Breakthrough Switch
Screenshot of Snowflake x Vandebron, from 9-hour jobs to 2 minutes

Steal this Anchor the headline on a single before-and-after time comparison (9 hours to 2 minutes) so readers grasp the magnitude of the improvement instantly without needing to read further.

Snowflake × Vandebron

Snowflake x Vandebron, from 9-hour jobs to 2 minutes

2 minutes to complete a job that previously took 9 hours

Efficiency
Screenshot of Algolia x Plieger Groep, from complaints to data-driven search

Steal this The 'before we had no data, just complaints' quote is a crisp, relatable way to express the Clarity before-state. It avoids abstract metrics and speaks directly to any operations or e-commerce team that has managed by anecdote.

Algolia × Plieger Groep

Algolia x Plieger Groep, from complaints to data-driven search

Average click position reduced from 16.00 to 5.5

Clarity
Screenshot of Docusign x Sensata Technologies, from filing cabinets to contract command center

Steal this The 'thousand years into the future' customer quote does the emotional heavy lifting without the vendor having to claim anything. Find one hyperbolic, unprompted customer line and let it anchor the whole piece.

Docusign × Sensata Technologies

Docusign x Sensata Technologies, from filing cabinets to contract command center

100% adoption by legal, with CLM central to daily work

New Capability
Screenshot of Front x Supacolor, $60k saved by fixing support handoffs

Steal this Frame support operations as a production line, then show how data from the tool revealed a root cause upstream (the website guidance gap) that cut costs. It turns a software efficiency story into a process intelligence story.

Front × Supacolor

Front x Supacolor, $60k saved by fixing support handoffs

$60,000 saved per year in unnecessary reprints

Efficiency Switch
Screenshot of Navan x Adient, 16% flight savings and self-serve travel for a global manufacturer

Steal this Acknowledging a real onboarding problem and showing it was fixed. This small concession builds trust and makes all the positive metrics more believable.

Navan × Adient

Navan x Adient, 16% flight savings and self-serve travel for a global manufacturer

16% savings on flights

Efficiency Switch
Screenshot of Snowflake x IMCD, from fragmented data to 8 AI use cases in a year

Steal this The 'multiyear foundation first, then rapid deployment' arc. Showing the slow, deliberate groundwork before the headline results makes the speed of AI rollout credible and pre-empts the skepticism that vendor case studies usually attract.

Snowflake × IMCD

Snowflake x IMCD, from fragmented data to 8 AI use cases in a year

8 AI use cases developed in a single year

New Capability
Screenshot of Elastic x Hino Computer System, from scattered logs to instant visibility

Steal this The unexpected benefit angle: on-site staff who were not network engineers independently learned to write search queries and build dashboards. Letting the customer name this outcome 'data democratization' in their own words makes the capability expansion feel earned rather than marketed.

Elastic × Hino Computer System

Elastic x Hino Computer System, from scattered logs to instant visibility

Log search time reduced from 30 minutes to seconds

Clarity
Screenshot of Figma x Mitsubishi Electric, building a cross-company design language from scratch

Steal this The 'theming' architecture detail, one common component base with per-business-unit brand customization, gives the case study a concrete mechanism that readers in large, multi-brand organizations can immediately picture applying to their own situation.

Figma × Mitsubishi Electric

Figma x Mitsubishi Electric, building a cross-company design language from scratch

Prototype build time from two weeks to one day

New Capability
Screenshot of Confluent x Michelin, 35% Kafka cost cut on the path to cloud

Steal this The three-tier quote sourcing: CIO for strategic framing, IT architect for technical detail, and integration architect for operational reality. It makes the story feel independently verified from inside the same company.

Confluent × Michelin

Confluent x Michelin, 35% Kafka cost cut on the path to cloud

35% cost savings vs. on-premises Kafka operations

Efficiency
Screenshot of Dropbox x Binladin Contracting Group, approvals from 2 days to 30 minutes

Steal this Anchor the story on a single, concrete time-to-approval comparison stated in the customer's own words. One specific process (IT hardware procurement) makes the abstract concept of faster approvals tangible.

Dropbox × Binladin Contracting Group

Dropbox x Binladin Contracting Group, approvals from 2 days to 30 minutes

Procurement approval process cut from 2 days to 30 minutes

Efficiency
Screenshot of Flexport x Gerber, from supply chain blindness to end-to-end visibility

Steal this Anchor the before-state in a concrete operational pain the buyer recognizes, such as five-plus hours per week on manual reporting, so the visibility win feels measurable rather than vague.

Flexport × Gerber

Flexport x Gerber, from supply chain blindness to end-to-end visibility

10% reduction in total costs in first year

Clarity
Screenshot of Ramp x Walther Farms, closing the books 10x faster

Steal this Anchor the headline metric to a before-and-after cycle time (20 days to 2 days) rather than a percentage, so readers immediately grasp the operational reality without doing math.

Ramp × Walther Farms

Ramp x Walther Farms, closing the books 10x faster

18 days saved closing the books each cycle

Efficiency Switch
Screenshot of Rippling x Aptera: $225K saved running HR as a team of one

Steal this Break the savings number into named line items (benefits headcount, payroll headcount, legal fees) so skeptical buyers can map each piece to their own org chart.

Rippling × Aptera

Rippling x Aptera: $225K saved running HR as a team of one

$225,000 saved per year

Efficiency Switch
Screenshot of Contentful x Bossard, replatforming a global manufacturer without losing a step

Steal this Anchor the replatform ROI to hours and euros saved during the migration itself, not after go-live. It makes the payoff immediate and tangible rather than hypothetical.

Contentful × Bossard

Contentful x Bossard, replatforming a global manufacturer without losing a step

Efficiency
Screenshot of Docusign x Crete United, contract bottleneck unlocks deal volume across 40+ companies

Steal this The before-versus-after volume number (3-5 reviews per month to 121 in four months) is a concrete throughput contrast that makes the bottleneck tangible without needing a revenue figure.

Docusign × Crete United

Docusign x Crete United, contract bottleneck unlocks deal volume across 40+ companies

121 contract reviews in four months (up from 3–5 per month)

Breakthrough
Screenshot of Docusign x Flowserve, from lost agreements to global visibility

Steal this Anchor the visibility problem to a concrete business consequence before introducing the product. The expired-agreements-eroding-margins detail makes an abstract data problem feel like a P&L threat.

Docusign × Flowserve

Docusign x Flowserve, from lost agreements to global visibility

Clarity
Screenshot of Retool x Komatsu, turning a call center into a revenue engine with agentic AI

Steal this Anchor the capability claim with a precise operational before-state (8,000 emails and calls per month, 5-plus minutes per call, dozens of siloed systems) so the 'impossible before' contrast is specific and credible rather than generic.

Retool × Komatsu

Retool x Komatsu, turning a call center into a revenue engine with agentic AI

$8 million in projected sales, 22,000+ hours saved annually

New Capability Switch
Screenshot of Lattice x Loop Earplugs, scaling people ops from 12 to 320 without losing the plot

Steal this The 'freedom in frame' framing for compensation: managers get a budget and guardrails but must justify deviations. It turns a vendor feature into a philosophy, making the product feel like a cultural decision rather than a software purchase.

Lattice × Loop Earplugs

Lattice x Loop Earplugs, scaling people ops from 12 to 320 without losing the plot

12 to 320 employees

New Capability